Saturday, 22 November 2008

Its finished


Well apart from tiding up a few bits its all done, and its only taken about a year......












Friday, 21 November 2008

Reverse stop and tunnel top

Put a m8 bolt through the tiger remote gear linkage to act as the reverse stop. Put the tunnel top back on and put on the hand brake and gear lever gaiters and secured the carpet with Velcro. Checked the wheel alignment and raised the front suspension to give a bit more ground clearance under the sump. refitted the nose cone.

Wednesday, 19 November 2008

Fuel filter and Cycle wings

Replaced the fuel filter with a larger one from halfords as the one i had was restricting the fuel flow. Put filler under the cycle wings to take up the space beyween the cycle wing stays and the wings themselves, secured with button head m8 stainless bolts.

Tuesday, 18 November 2008

Metro Brake shoes

Replaced the brake shoes and cylinders on the back of my dads metro while he faffed around watching, so not done a lot on the tiger today.

Monday, 17 November 2008

Dash and garage clearout

Finished tiding up the loom under the dash, wired up the horn button, put on the proper steering wheel. Then had a garage clearout

Sunday, 9 November 2008

Boot cover

Just finished the boot cover - ply wood covered with tigers faux leather covering that came with the kit and a bit of radiused steel angle to go round the roll hoops at the front.






After the sva test i will cut a hole in it and make a lockable hinged lid.

Saturday, 8 November 2008

Carpet Fitted

Carpets fitted.... its starting to come together, it seems to make a big difference with the final touches.