Tiger Avon Build diary..... I've finished building a zetec engined Tiger Avon with GSX-R750 throttle bodies all powered by Megasquirt.
Saturday, 22 November 2008
Friday, 21 November 2008
Reverse stop and tunnel top
Put a m8 bolt through the tiger remote gear linkage to act as the reverse stop. Put the tunnel top back on and put on the hand brake and gear lever gaiters and secured the carpet with Velcro. Checked the wheel alignment and raised the front suspension to give a bit more ground clearance under the sump. refitted the nose cone.
Wednesday, 19 November 2008
Fuel filter and Cycle wings
Replaced the fuel filter with a larger one from halfords as the one i had was restricting the fuel flow. Put filler under the cycle wings to take up the space beyween the cycle wing stays and the wings themselves, secured with button head m8 stainless bolts.
Tuesday, 18 November 2008
Metro Brake shoes
Replaced the brake shoes and cylinders on the back of my dads metro while he faffed around watching, so not done a lot on the tiger today.
Monday, 17 November 2008
Dash and garage clearout
Finished tiding up the loom under the dash, wired up the horn button, put on the proper steering wheel. Then had a garage clearout
Sunday, 9 November 2008
Boot cover
Just finished the boot cover - ply wood covered with tigers faux leather covering that came with the kit and a bit of radiused steel angle to go round the roll hoops at the front.
Saturday, 8 November 2008
Carpet Fitted
Carpets fitted.... its starting to come together, it seems to make a big difference with the final touches.
Subscribe to:
Posts (Atom)